Waiver of Inter-State Transmission Charges on transmission of electricity generated from Solar and Wind Energy
According to the present Order, renewable energy projects falling under para 3.1 (i), (ii), and (iii) of the Order dated 23th November, 2021 and in accordance with the Order dated 30th November, 2021 are eligible for the waiver of inter-state transmission charges. These projects, with their scheduled date of commissioning on or before 30th June, 2025, can now benefit from an extension of time granted by the MNRE.
NTPC Vidyut Vyapar Nigam Limited commissions 1 MW Rooftop Solar Power Project at IIT Jodhpur
The rooftop solar project at IIT Jodhpur has been set up across the roofs of 14 buildings within the campus. It is estimated to generate approximately 14.9 lakhs units of electricity annually, meeting 15% of the institute’s electricity requirements.