Owners of Electric Vehicles can now charge them at their residence/offices using their existing electricity connections.

The Union Ministry of Power on 14th January 2022 has promulgated the revised consolidated Guidelines & Standards for Charging Infrastructure for Electric Vehicles. The objective is to enable a faster adoption of electric vehicles in India by ensuring safe, reliable, accessible and affordable Charging Infrastructure and eco-system. This would also promote energy security and reduction of emission intensity of the country by promotion of entire EV ecosystem.

Any individual/entity is free to set up public charging stations without the requirement of a license provided that, such stations meet the technical, safety as well as performance standards and protocols laid down  under the guidelines as well as norms/ standards/ specifications laid down by Ministry of Power, Bureau of Energy Efficiency (BEE) and Central Electricity Authority (CEA) from time to time. An exhaustive list of compliance requirements for Public Charging Station (PCS) have also been outlined. These include norms for “appropriate” infrastructure  for civil, electricity and safety requirements.

The guidelines have been made further technology agnostic by providing for not only the prevailing international charging standards available in the market but also the new Indian charging standards. The Timelines for providing connectivity for the installation of Public Charging Station have been prescribed as per the Electricity (Rights of Consumers). Accordingly, PCS shall be provided connection within seven days in metro cities, fifteen days in other municipal areas and thirty days in rural areas.

Any Public Charging Station/ Chain of Charging Stations may obtain electricity from any generation company through open access. Open Access shall be provided for this purpose within 15 days of receipt of the application complete in all respect. They will be required to pay the applicable surcharge – equal to the current level of cross subsidy (not more than 20 percent, as per the Tariff Policy Guidelines), transmission charges and wheeling charges. No other surcharge or charges shall be levied except mentioned in this provision.

Public Charging Station will be required to tie up up with at least one online Network Service Providers (NSPs) to enable advance remote/online booking of charging slots by EV owners. Such online information to EV owners should also include information regarding location, types and numbers of chargers installed/available, service charges for EV charging etc.

RECENT UPDATES