Government of West Bengal notified SOP for issuance of Manufacturers, Dealers and Repairers License under the West Bengal Legal Metrology (Enforcement) Rules, 2011.

The Government of West Bengal on 4th November 2022, published the Standard Operating Procedure (SoP) for issuance of Manufacturers, Dealers and Repairers License under the West Bengal Legal Metrology (Enforcement) Rules, 2011.

The purpose of this SoP is to establish the procedure for processing and disposing application in LM-1, LD-1 and LR-1 for issuance of manufacturer, dealership and repairer license in LM-3, LD-3 and LR-3 respectively under rule 11 of the West Bengal Legal Metrology (Enforcement) Rules, 2011 through e-Parimap portal available at https://dolmwb.gov.in

The SOP specifies documents required along with the application (i.e. LM-1, LD-1 and LR-1) for disposal and it also envisages the legal requirements i.e. maintenance of register, submission of the report under the West Bengal Legal Metrology (Enforcement) Rules, 2011 and the West Bengal Right to Public Services Rules, 2013.

The applicant shall first register himself/herself at e-Parimap portal available at https://dolmwb.gov.in by providing valid e-mail id. and mobile no.. Applicant shall fill up the relevant electronic form and upload the signature of the applicant in JPG format of maximum size 100 kB along with mandatory documents of appropriate size and format as specified in Annexure A. On successful submission of the application, the applicant shall receive a confirmation message through SMS and e-mail. The system shall automatically allot the application to the concerned ACLM

Since the processing of license has been made online therefore system shall prepare and maintain Register in Form IV under the West Bengal Right to Public Services Rules, 2013 and register in Schedule V of the West Bengal Legal Metrology (Enforcement) Rules, 2011 and shall be made available to all users.

Maximum time limit for disposing of an application for a license at the level of specially empowered DCLM is fifteen (15) days. If the application for Manufacturers/ Dealers/ Repairers license is found complete and suitable, the specially empowered DCLM shall allow the applicant to deposit necessary fees.

RECENT UPDATES