Odisha Renewable Energy Policy, 2022

All large hydro, small hydro, ground-mounted solar, rooftop solar, floating solar, canal top solar, wind, biomass, energy storage (including pumped storage hydro, 4 battery energy storage system), waste-to-energy, green hydrogen/green ammonia projects or any other renewable energy technology and new initiatives/ pilot projects commissioned in the State of Odisha during the Policy period shall be guided by this Policy.

The Punjab Govt. notifies the PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2022

The Regulations prescribe the principles for determination of Tariff and Norms for Operation for Transmission Business and SLDC Business. The Regulations also detail the requirements for filing of Business Plan/Multi-Year Tariff/True Up/Aggregate Revenue. Annexure A of the Regulation states the Segregation of ARR of Wheeling and Retail Supply Business.

Odisha Govt launches scheme on One Time Settlement of Arrear Electricity Duty and Interest

The Scheme of One Time Settlement (OTS) of arrear electricity duty and interest will be applicable to consumers who generate energy for their own use or consumption (Captive consumers). As per the scheme interest would be charged at a reduced rate of interest @ 9% per annum for those Captive Power Plants (CPPs) who want to avail the benefits of the scheme.

The Distribution of Electricity Licence (Additional Requirements of Capital Adequacy, Creditworthiness and Code of Conduct) (Second Amendment) Rules, 2022.

it is hereby clarified that for the grant of a license for distribution of electricity within the same area in terms of sixth proviso to section 14 of the Act, the entire area covering either a Municipal Corporation as defined in article 243Q of the Constitution or three adjoining revenue districts, or a smaller area as may be notified by the Appropriate Government shall be the minimum area of supply.

Petroleum and Natural Gas Regulatory Board (Determining Capacity of Petroleum, Petroleum Products and Natural Gas Pipeline) Amendment Regulations, 2022

Wherever there is any change in the capacity of natural gas pipeline in the past or in future due to reason(s) as approved by the PNGRB’s Board, in such cases entity shall submit the revised capacity of the natural gas pipeline, separately due to each such reasons, to PNGRB in terms of these regulations for capacity determination and approval of the Board.