FSSAI issues Protocol on Methods of Fortificant Testing for Rice

The entire sample must be ground into a homogenous mixture before weighing the sample for analysis. The remaining quantity of tested samples should be preserved for at least 3 months from the date of reporting. The samples shall be stored in refrigerators at temperatures of 5 to 10 degree celsius.

FSSAI to conduct PAN-India Milk & Milk Products Surveillance 2023

In order to sustain the mandate of providing safe & wholesome food for human consumption, the said survey will be initiated with an objective to assess the Milk & Milk products sold in the country for compliance of the quality and safety parameters as given in FSSR, to identify hotspots for adulteration in milk and milk products & to devise corrective actions/ strategies based on the results of the study and suggest a way forward.

Sugar mills to register on NSWS portal

Directorate of Sugar and Vegetable oil has requested sugar mills to register themselves on NSWS portal (https://www.nsws.gov.in) and fill their P-II form by 10th of every month.

FSSAI directions regarding claims in advertisements by FBOs

Where a claimed health benefit is attributed directly to the product, it shall be based on statistically significant results from well-designed human intervention studies, conducted by or under guidance of established research institutions, in line with the principles of GCP (Good Clinical Practices) and peer reviewed or published in a peer reviewed reputed scientific journal.

FSSAI launches FOSCOS in regional languages

The availability of the FOSCOS application in Hindi and all regional languages will also help the FBOs in getting a better understanding of the Food Safety Compliance System. The availability of the system in Hindi and all regional languages will lead to a higher rate of confidence and increased participation by FBOs.

Temporary Downtime of FoSCoS Portal

The FoSCoS portal will remain non-operational for 3 days i.e. 28th April, 2023 to 30th April, 2023. This is due to scheduled migration activity of database server.