ALMM for Solar Panels to Resume Operations on April 1st

The MNRE has now announced the recommencement of the ALMM for solar photovoltaic modules. However, the memo clarifies that solar power developers who received solar PV modules at their project sites by March 31, 2024 and were unable to commission them due to reasons beyond their control will be examined on a case-by-case basis.

Government Tightens Regulations on Ash Utilization in Thermal Power Plants

Thermal Power Plants shall reserve a certain percentage of ash for supply to micro and small enterprises engaged in ash-based product manufacturing. These products include bricks, blocks, tiles, aggregates, cement sheets, pipes, and panels. They must be sold at concessional prices or through limited auctions as per guidelines issued by MoP.

Amendment to Approved Models and Manufacturers of Solar Photovoltaic Modules Order, 2019

The Ministry of New and Renewable Energy (MNRE) has modified reforms in the Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order, 2019. MNRE has revised these thresholds, aligning them with BIS standards and specifying minimum module efficiency requirements for each category. This Office Memorandum was issued on March 22, 2024.

Updates in List of Approved Solar Photovoltaic Module Manufacturers and Models

Under the updated Approved List of Models and Manufactures for Solar Photovoltaic Modules, the enlistment of models of Solar PV Module Manufacturers in the Approved List of Models and Manufacturers (ALMM) will be subject to stringent criteria. Only models that comply with the Bureau of Indian Standards (BIS) and meet the minimum module efficiency requirements will be eligible for enlistment under ALMM.

New Circular Released on Insurance Products for Solar Power Plants

the Ministry has received an updated roster of insurers from IRDAI. Consequently, MNRE has issued an updated list of insurers offering insurance products against risks associated with solar power plants. This step aims to inform all stakeholders about the available insurance options for solar power plants, fostering better risk management in the sector.

Electricity Rules Amended to Address Renewable Energy Sources

These Amendment Rules have empowered the Central Government to establish distinct central pools for various categories of Renewable Energy Sources. These pools will operate for a duration of three years from the date specified in the order issued by the Central Government.

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, (Revision-I) 2021 (Fourth Amendment) 2024

The notification issued by Madhya Pradesh Electricity Regulatory Commission serves to modify the existing regulations related to intra-state open access to electricity in Madhya Pradesh, specifically addressing the imposition of additional surcharges on consumers who surpass their contract demand with the Distribution Licensee.

Methodology for Allocation of Coal under SHAKTI Policy Revised by Ministry of Coal

Auction of coal linkages will be conducted under three distinct windows, each catering to different delivery periods: 3 months, 6 months, and 12 months respectively. To facilitate transparency and accessibility, coal companies such as CIL/SCCL will identify specific areas/mines within their subsidiaries earmarked for allocation under these guidelines. This information will be published on e-auction websites well in advance of each auction, detailing the quality and quantity of coal available, as well as the proposed supply schedule.