Assam PCB issues SOP for processing application for Obtaining CTE/CTO.
The Processing of application for CTE shall be integrated for the drilling wells and associated installation covered under the corresponding environmental clearance granted to project proponent in order to facilitate streamlining of the entire process.
MPCB to grant emergency Permission to industries for Operation of Medical Oxygen Manufacturing Plants.
As an emergency Interim measure, The MPCB considers all the Oxygen Manufacturing project/activity as a “Priority Activity”.
Guidelines for recognition of Environmental Laboratories under the Environmental Protection Act, 1986
For successful implementation of environmental protection programs, it is essential to identify and quantify the pollution sources, pollutants, conduct baseline survey, lay down standards and build-up monitoring systems. To meet out these requirements, a competent laboratory is required with all
necessary instruments, equipment, expertise, capabilities etc.
Assam PCB mandates poultry farms to obtain consent to operate
All existing poultry farms having more than 5000 birds shall apply for consent to operate within 3 months
All upcoming poultry farms proposing to have more than 5000 birds shall apply for consent to operate within 120 days.
Environment (Protection) Amendment Rules, 2021
The Environment (Protection) Amendment Rules, 2021 provides that a task force shall be constituted by Central Pollution Control Board (CPCB) comprising of representative from Ministry of Environment and Forest and Climate Change, Ministry of Power, Central Electricity Authority (CEA) and CPCB to categorize thermal power plants in three categories on the basis of their location to comply with the emission norms within the time limit.
Kerala PCB issues Standard Operating Procedure for rendering plants
Rendering plants shall have consent to operate from PCB under red category to operate. Minimum distance from plant to nearest residential area shall be 100 meters.
Kerala PCB issues Standard Operating Procedure for monitoring of noise level of industries
The SOP suggests to Adopt proper town planning practices like zoning areas into residential, commercial and industrial area and segregation of the same.
Maharashtra PCB mandates DISH approval to obtain consent to operate
Every manufacturer shall obtain necessary permission from the Directorate of Industrial Safety and Health in order to get consent to establish/operate/renewal.
MoEF & CC provides timeline for project proponents to reply to the Essential Details Sought by the Impact Assessment Division
Considering that many project proponents do not reply/delay the reply to the Essential Details Sought (EDS) by the Impact Assessment Division, it has now been decided that in case the reply to EDS is not received on PARIVESH within 30 days, the proposal will be excluded from the pendency list shown on PARIVESH.
Government of Kerala to refund the consent fee for industrial units.
For integrated consent to establish applications, one year fee may be retained, and the rest can be refunded and for the renewal of integrated consent to establish, one year fee may be retained, and rest can be refunded.