Assam PCB notifies the guidelines for processing of consent application.

As per the provisions of the Water Act, 1974 and Air Act, 1981 mandates processing of CTE/CTO within 120 days, however there has been significant delays in processing the application by the board therefore the following guidelines has been formulated which shall come into force with immediate effect.

CPCB publishes Environmental Guidelines For Poultry Farms.

The poultry farms under small category are in un-organized sector run by economically weaker farmers and are of rural background. The Poultry Farms are categorized under “Green” Category, therefore validity of consent will be 15 yrs.

Draft Plastic Waste Management Rules, 2022.

Environmental Compensation shall be levied based upon polluter pays principle, on person(s) not adhering to the provisions of these rules, for the purpose of protecting and improving the quality of the environment and preventing, controlling and abating environment pollution.

MoEF issues notification on ash utilisation from coal or lignite thermal power plants.

Every coal or lignite based thermal power plant shall ensure that loading, unloading, transport, storage and disposal of ash is done in an environmentally sound manner and that all precautions to prevent air and water pollution are taken and status in this regard shall be reported to the concerned State Pollution Control Board (SPCB) or Pollution Control Committee (PCC)